You will find information about the current stage of the SE Plan on the Sussex Wildlife Trust web site, but I thought I would spend some time highlighting the size of the gap between the growth and development desires in the SE Plan versus the need for sustainability.
Even the Government’s own Sustainability Appraisal concludes that the changes now proposed by the Secretary of State will result in the environmental limits of the South East being approached and possibly even breached. These changes do not just increase the level of environmental damage associated with the Plan, but also substantially lower the quality of life of the region’s population. The Plan cannot even guarantee to protect the most important wildlife sites – those protected because of the international importance – so what hope is there for our nationally or locally important wildlife habitats?
If we look a little closer at the figures we can see the size of the problem we face.
Never mind “the environmental limits of the South East being approached”, work by the Government Office for the South East a few years ago has shown that the ecological footprint for the South East is already 29 times its physical area. That means that we need an area the size of France just to support our lifestyle.
So we already consume an area far bigger than we actually have – but we plan to grow further.
The plan has an economic growth goal of 3% per annum – very attractive in terms of our personal wealth, but what does this mean? A 3% growth rate results in a doubling time of 23 years (just longer than the life of the plan). In 23 years time our economy will be double the size that it is now and will have double the resource requirements that it has now. So, roughly by the end of the plan we will be using double the number of resources that we use now. How sustainable is that bearing in mind the ecological consequences of the resource use we have now?
The maths also draws us towards another startling conclusion. Take the period from now -2008 - to the end of that doubling period (23 years time) the year 2031. In that period we will use the same amount of resources as we have done in our entire history up until 2008. This is simply the maths of how exponential growth works.
I cannot see how some of our most cherished wildlife can survive even at the current level of human activity even if we could rely on an area the size of France to support us. How it could survive when we have double the level of activity and after using as many resources as we have used in our entire history is even more difficult to understand.
The SE Plan has good phrases about stabilising and then reducing resource use, about reducing greenhouse gas emissions and responding to climate change, about protecting wildlife and the environment. And I do believe that the people involved are sincere, honourable people who are doing their best for the region. But a 30% increase in housing numbers for Sussex (even over the huge figures already proposed), a desire for economic growth of 3% (without any real question of the nature of that growth and its effects), population increase, “infrastructure” development, water use, resource use, energy use and land taken away from nature – all severely undermine any attempt at long term sustainability. The environment is going to be negatively impacted, we are going to loose wildlife and its habitats and the lives of the people in the region are going to get worse.
Showing posts with label South East Plan. Show all posts
Showing posts with label South East Plan. Show all posts
Wednesday, 15 October 2008
Wednesday, 29 August 2007
The Inspectors report on the south East Plan
Last year a panel of Inspectors sat to examine the South East Plan. I gave evidence on behalf of SWT, and many other conservation organisations also spoke. This panel has now reported and we can now see their document.
Any report on a regional plan is bound to be vast so this is just a first impression. We must also realise that there is probably a limited amount that a regional plan, and any subsequent report, can achieve. But it is the most strategic document that we are likely to be able to influence so if we are not happy, we should not be shy saying so.
Just what is being proposed by the plan and now by the Inspectors?
First, the Inspectors recommend that house building numbers for the South East should go up from 29,000 per year to 32,000. In the plan period that’s an extra 62,000 houses. To put that into context that is larger than Worthing just for the extra houses!
The total amount of housing planned for before 2026 is 640,160 – that is equivalent to about 14 Worthing’s. At the recommended density housing will cover 16,000ha, or 160 sq km, (not allowing for infrastructure like roads, shops, businesses etc). This is nearly half the size of the Isle of Wight.
These are worrying figures!
Climate change and our ecological footprint.
Some aspects of both the Plan and the Inspectors report sound quite good. Addressing climate change and a reducing our ecological footprint are examples. Yet all these are merely aspirational. There may be good words on climate change for instance but the overall plan will result in massive increases in greenhouse gas – at a time when the scientific evidence is that a 60% reduction is probably far too little. The plan period runs until 2026, Climate change simply must be addressed in that time.
The panel even attempts to excuse likely poor performance in terms of the aim to reduce the ecological footprint of the South East. It indicates that the increased footprint form all the extra development will be offset by massively reduced resource and energy use elsewhere in the business sector. This may sound good but there is no evidence of these improved efficiencies. There will have to be an awful lot of efficiency improvements in existing businesses and buildings to counteract the increased ecological footprint of over 640,000 new homes.
Transport
Transport plans do have some good indications in that the panel wish to see car use reduced, with more restrictions on cars and road charging. The panel, however, “believe it to be unrealistic to achieve an absolute reduction during the life of the Plan”. This reflects a lack of urgency regarding climate change, resource use and the need to reduce our ecological footprint. Again we must bear in mind that this is a 20 year plan – such issues simply must be addressed in this time.
Similarly with airports, the report still asks the plan to cater for a possible extra runway at Gatwick. Again, there seems to be no recognition of the urgency of climate change and the need to consider what to do about the fastest growing contributor to greenhouse gases
Nature Conservation.
The nature conservation elements of the plan have remained intact, and this is welcomed. We have, however, campaigned for nature conservation to be pushed higher up in the strategy. We asked for a “green infrastructure” policy to be included as one of the cross-cutting policies. In doing so we wish to see an ambitious ecological network rolled out as a positive environmental agenda so development has to go hand in hand with environmental improvement. This should have been a real basis for a win-win approach. On the face of it we won the argument and a green infrastructure policy is now recommended. The policy itself, however, needs to be considerably improved. It seems simply to refer to urban greenspace – important in itself but hardly the large scale, integrated environmental enhancement that is required to counter-balance such huge development pressure.
Water resources.
Water resources are a problem in the South East, with less water per head of population than in Ethiopia. However, the panel considers that water efficiency measures and water resource development will answer the problem. This sounds good but Water Companies are sceptical that water efficiency can be delivered on the scale required. More importantly this report hits the problem that all reports do at this point – it is committing us to resource development that has not even been properly examined in terms of its environmental effects.
Disappointing!
All in all the report from the panel of Inspectors is disappointing but not surprising. People are doing their best but the engine that drives environmental damage grinds on.
This one change please!
If I were to ask for one big improvement that I think could be achieved it would be to have a very positive and expansive ecological network properly integrated into the spatial strategy of the Plan. If we are going to have to have all this development then it must go hand in hand with environmental enhancement. And this environmental enhancement must be orders of magnitude greater than we have experienced so far.
Any report on a regional plan is bound to be vast so this is just a first impression. We must also realise that there is probably a limited amount that a regional plan, and any subsequent report, can achieve. But it is the most strategic document that we are likely to be able to influence so if we are not happy, we should not be shy saying so.
Just what is being proposed by the plan and now by the Inspectors?
First, the Inspectors recommend that house building numbers for the South East should go up from 29,000 per year to 32,000. In the plan period that’s an extra 62,000 houses. To put that into context that is larger than Worthing just for the extra houses!
The total amount of housing planned for before 2026 is 640,160 – that is equivalent to about 14 Worthing’s. At the recommended density housing will cover 16,000ha, or 160 sq km, (not allowing for infrastructure like roads, shops, businesses etc). This is nearly half the size of the Isle of Wight.
These are worrying figures!
Climate change and our ecological footprint.
Some aspects of both the Plan and the Inspectors report sound quite good. Addressing climate change and a reducing our ecological footprint are examples. Yet all these are merely aspirational. There may be good words on climate change for instance but the overall plan will result in massive increases in greenhouse gas – at a time when the scientific evidence is that a 60% reduction is probably far too little. The plan period runs until 2026, Climate change simply must be addressed in that time.
The panel even attempts to excuse likely poor performance in terms of the aim to reduce the ecological footprint of the South East. It indicates that the increased footprint form all the extra development will be offset by massively reduced resource and energy use elsewhere in the business sector. This may sound good but there is no evidence of these improved efficiencies. There will have to be an awful lot of efficiency improvements in existing businesses and buildings to counteract the increased ecological footprint of over 640,000 new homes.
Transport
Transport plans do have some good indications in that the panel wish to see car use reduced, with more restrictions on cars and road charging. The panel, however, “believe it to be unrealistic to achieve an absolute reduction during the life of the Plan”. This reflects a lack of urgency regarding climate change, resource use and the need to reduce our ecological footprint. Again we must bear in mind that this is a 20 year plan – such issues simply must be addressed in this time.
Similarly with airports, the report still asks the plan to cater for a possible extra runway at Gatwick. Again, there seems to be no recognition of the urgency of climate change and the need to consider what to do about the fastest growing contributor to greenhouse gases
Nature Conservation.
The nature conservation elements of the plan have remained intact, and this is welcomed. We have, however, campaigned for nature conservation to be pushed higher up in the strategy. We asked for a “green infrastructure” policy to be included as one of the cross-cutting policies. In doing so we wish to see an ambitious ecological network rolled out as a positive environmental agenda so development has to go hand in hand with environmental improvement. This should have been a real basis for a win-win approach. On the face of it we won the argument and a green infrastructure policy is now recommended. The policy itself, however, needs to be considerably improved. It seems simply to refer to urban greenspace – important in itself but hardly the large scale, integrated environmental enhancement that is required to counter-balance such huge development pressure.
Water resources.
Water resources are a problem in the South East, with less water per head of population than in Ethiopia. However, the panel considers that water efficiency measures and water resource development will answer the problem. This sounds good but Water Companies are sceptical that water efficiency can be delivered on the scale required. More importantly this report hits the problem that all reports do at this point – it is committing us to resource development that has not even been properly examined in terms of its environmental effects.
Disappointing!
All in all the report from the panel of Inspectors is disappointing but not surprising. People are doing their best but the engine that drives environmental damage grinds on.
This one change please!
If I were to ask for one big improvement that I think could be achieved it would be to have a very positive and expansive ecological network properly integrated into the spatial strategy of the Plan. If we are going to have to have all this development then it must go hand in hand with environmental enhancement. And this environmental enhancement must be orders of magnitude greater than we have experienced so far.